Hunter Valley

Water balance component

Sources of water

Distribution of water

% of volume measured

  Volume (ML) % of total Volume (ML) % of total  

Storage Volume

         
Volume in storage at start of year  1,017,711        
Volume in storage at end of year  900,097        
Change in storage  117,614 32%      
Barnard  Reserve (4)       0% 100%
Storage net evaporation     54,611  15% 100%

Inflows

         
Storage inflows (1) 51,688 14%     100% 
Downstream tributaries (2) 193,274 53%      50% 
Subtotal 244,962 68%      

Net water diverted under riparian rights

         
Domestic and stock rights (3)     450  0% 0% 
Native title rights      - 0%  
Subtotal     450  0%  

Net Water diverted under access licences

     -    
Domestic and stock      466 0% 100% 
High security      6,735 2%  100%
General security      54,750 15%  100%
Local water utility      7,108 2%   100%
Major utility      30,688 8%  100% 
Major utility (dilution)     0% 100% 
Supplementary water     15,637 4% 100%
Barnard Reserve (dilution)      - 0%  100% 
Subtotal     115,384 32%   

Environmental water

         
Net diversions to wetlands     27,773 8%  100% 
End of system flows (5)     164,358 45%  90%
Subtotal     192,131 53%  

Other outflows

         
Unaccounted difference (6)     - 0%   
Total 362,576 100% 362,576 100%  

Notes:

  1. Calculated from Glenbawn and Glennies Creek Dams evaporation and releases, less storage drawdown and Barnard Reserve inflows.     
  2. Downstream tributaries - assessed by mass balance at Greta.  Recorded trib flows were Gauged=127095ML and Ungauged=66,179ML
  3. Basic rights are not metered.  Values presented are those in the Water Sharing Plan.
  4. Barnard Reserve accumulates from an inter valley physical transfer. 
    • "Total Barnard Reserve at end of month  0"
  5. Gauged at Greta (not the end) - flows greater than environmental target are provided     
  6. All unaccounted source flows included in tributary inflows and includes spill from Dams.     
  7. Planned environmental water delivery requirements were met 100% in 2013-14.